Kitchen Remodel 
Day 1 Kitchen
Day 1 Kitchen
Viewed: 101 times.

Another on day 1
Another on day 1
Viewed: 83 times.

Viewed: 93 times.

IMG_1744.JPG
IMG_1744.JPG
Viewed: 97 times.

IMG_1745.JPG
IMG_1745.JPG
Viewed: 97 times.

Living Room day 1, the hardwood has been acclimating for a week.
Living Room day 1, the hardwood has been acclimating for a week.
Viewed: 81 times.

An example of the tile situation that spawned this whole project.  Tile was put down over particle board by prior owner, and 30-40% of it loose/cracked
An example of the tile situation that spawned this whole project. Tile was put down over particle board by prior owner, and 30-40% of it loose/cracked
Viewed: 70 times.

Sink
Sink
Viewed: 77 times.

IMG_1750.JPG
IMG_1750.JPG
Viewed: 85 times.

Powered by Gallery v1 RSS